Cyclone Oswald 2013 Part 2 Aftermath Toogoom
http://www.toogoom.net.au/news/cyclone-oswald-flooding-2013/ http://www.toogoom.net.au/news/cyclone-oswald-flooding-2013/ Cyclone Oswald Part 2 Aftermath [video poster="http://www.toogoom.net.au/wp-content/uploads/2017/10/news.png" width="320" height="240" mp4="http://www.toogoom.net.au/wp-content/uploads/2017/10/oswald.mp4"][/video] Fast forward 96 days. It started again, torrential downpours and low pressure systems. On the Esplanade, council had just built a new turn around bay for the garbage trucks when they changed contractors over to the current contractors as their trucks could not get it. That combined with a new house being built at the end of the street were the precipice of further disaster. The rains came down and the water came up. Where the water would previously drain along a natural water way parallel...